I have a drawing that I am trying to create where I have a sub assembly that attaches to a larger assembly. For my drawing I have added both the subassembly and larger assembly to my drawing and I have created a regular view of the subassembly and a Phantom Opaque view of the larger assembly for reference. My issue now is that I need to align the two views. I seem to remember designers at a previous job doing this by aligning coordinate systems in the drawing views, but I can't seem to find a way to do this in WF4. For reference, I am using this method so that I don't create seperate "drawing models" that are unrelated to my top level master model (the drawing models have a tendency to get out of sync and are a pain to maintain). Also, I don't have write access to the top level master model so I can't use simplified reps. If anyone has advice on this issue, I would love to hear it.
↧